Energy Sovereignty
From solar EPC to grid-scale BESS — building Bharat's path to 500 GW non-fossil and energy independence.
Bondada × Bharat — Aligned with the Nation
Every Bondada Group business is engineered to deliver on a national mission — from Mission 500 GW renewable capacity to Atmanirbhar Bharat defence and rail. Here is how our nine business pillars translate India's sustainability policies into measurable execution on the ground.
Four sovereignties
Bharat's path to 2047 demands sovereignty in energy, digital, strategic, and inclusive growth. Bondada Group is engineered to deliver in all four.
From solar EPC to grid-scale BESS — building Bharat's path to 500 GW non-fossil and energy independence.
Telecom EPC, FTTX, OFC, and data centres connecting every village to Digital India.
Indigenous defence manufacturing and railway Kavach — Atmanirbhar Bharat at scale.
Bondada Foundation, rural electrification, women empowerment — progress that touches grassroots.
The alignment matrix
Each Bondada Group business directly supports a specific Government of India mission. Click any card to see the full execution detail.
Bondada
National Mission · Mission 500 GW
500 GW non-fossil capacity by 2030
Execution
1.3 GWp commissioned · 5.2 GWp under execution · 25 GW target by 2030
Bondada
National Mission · NFESS 2023
National Framework for Energy Storage Systems
Execution
TNGECL 400 MWh / 200 MW BESS — ₹836 Cr · 24x7 dispatchable green power
Bondada
National Mission · Atmanirbhar Bharat
Indigenous Defence & Railway Modernisation
Execution
₹228.17 Cr South Central Railway HDN deployment · indigenous ATP
Bondada
National Mission · BharatNet & Digital India
Universal broadband for 6 lakh+ Gram Panchayats
Execution
60,000 RKM fibre management · Pan-India tower O&M · BSNL ₹1,156 Cr scale
Bondada
National Mission · Gati Shakti / NIP
₹111 Lakh Cr National Infrastructure Pipeline
Execution
1,000 MT/month transmission towers (66kV-400kV) · 2,000 MT/month HDG · 1,500+ MT/month MMS
Bondada
National Mission · Atmanirbhar Bharat — Defence
Indigenous defence manufacturing & exports
Execution
First defence order from BEL · serving Indian Armed Forces & DPSUs
Bondada
National Mission · Smart Cities & SSR
Energy-efficient rural & urban lighting
Execution
674+ Panchayats lit in Bihar (BREDA) · SSR Category-1 (AP) approval
Bondada
National Mission · FAME II / NEMMP
Faster Adoption of Electric Vehicles
Execution
Atpole BLDC motors for EVs, industrial automation, renewables
Bondada
National Mission · Pradhan Mantri Awas Yojana / NMSH
Affordable, sustainable housing materials
Execution
uPVC windows · AluRise aluminium · AAC blocks · pre-engineered buildings
Our north stars
Bondada Group's milestones map directly to India's headline ambitions — Panchamrit, Viksit Bharat 2047, and Net-Zero 2070.
2030
Bondada's renewable target — fivefold scale-up from 2 GW under execution today.
2030
Strategic ambition to triple revenue and cement Bondada as a top-tier infra leader.
2047
Contributing to India's Centenary vision — developed nation status across infra, energy, and digital.
2070
Aligned with India's COP26 Net-Zero pledge through deep decarbonisation portfolios.
Geography of execution
Bondada Group's projects span the length of Bharat — from the 2.6 GWdc Andhra Pradesh solar installation (₹9,000 Cr) to the 100 MW Advantage Assam 2.0 commitment, the Khavda 600+ sites Gujarat renewable office, Tamil Nadu BESS, Maharashtra solar, Bihar Bee-lite Panchayats, Telangana BHEL solar, and the South Central Railway corridor.

Pan-India
Telecom O&M across South India · Solar EPC across 8 states · Railway corridor in AP/Telangana
Partner with us
Whether you're a public-sector enterprise, a marquee private operator, or a global technology partner — let's engineer the next chapter of Bharat's growth story together.